Our approach is comprehensive, guiding clients through every stage of the management system lifecycle.

We believe that a well-structured management system is not merely a compliance requirement; it is a strategic asset that enhances operational efficiency, drives continuous improvement, and fosters a culture of excellence across all levels of the organization.

QPlus Management System Consultancy Phases

QPlus Management System Consultancy delivers a comprehensive, phased approach to help organizations design, implement, and optimize management systems tailored to their unique needs. Below is a detailed description of the five phases:

STAGE 1:

Gap Analysis (5%)

This initial phase identifies the discrepancies between the current state of the organization and the requirements of the target management system or standard.

  • Objective: To establish a clear understanding of the organization’s current position and outline a roadmap for improvement.
  • Activities:
    • Conducting interviews with key stakeholders to understand the current processes, policies, and organizational structure.
    • Assessing the existing documentation, systems, and practices.
    • Benchmarking against the desired standard (e.g., ISO, legal, or industry-specific requirements).
  • Deliverables:
    • A detailed gap analysis report highlighting areas of compliance, non-compliance, and areas for improvement.
    • Recommendations for bridging gaps, prioritized by importance and impact.
Stage 2:

Business Strategy and High-level Documents (25%)

This phase focuses on aligning the management system with the organization’s strategic goals and establishing foundational documents.

  • Objective: To ensure that the management system reflects the organization’s strategic vision and provides a clear direction.
  • Activities:
    • Defining the organization’s mission, vision, values, and objectives in alignment with the management system requirements.
      Developing high-level documents such as policies, goals, and system scopes.
    • Mapping out the organizational structure and assigning responsibilities.
  • Deliverables:
    • Key policy documents (e.g., Quality Policy, Environmental Policy).
    • High-level strategic alignment plans.
    • A management system framework tailored to the organization’s goals.
Stage 3:

Operation Processes and Procedures (50%)

This is the most intensive phase, where detailed processes and procedures are developed to meet the requirements of the management system.

  • Objective: To establish a robust operational foundation that ensures compliance, efficiency, and scalability.
  • Activities:
    • Designing and documenting operational processes, workflows, and procedures.
    • Integrating existing best practices with new requirements to create streamlined operations.
    • Implementing process controls and mechanisms for monitoring performance.
  • Deliverables:
    • Comprehensive Standard Operating Procedures (SOPs).
    • Flowcharts and process maps for key activities.
    • Checklists, forms, and templates for operational consistency.
Stage 4:

Auditing and Training (15%)

This phase ensures the management system is correctly implemented and prepares employees to effectively use it.

  • Objective: To validate the system’s implementation and equip the workforce with the necessary skills and knowledge.
  • Activities:
    • Conducting internal audits to verify compliance with documented processes
    • and procedures.
    • Identifying and addressing non-conformities or inefficiencies.
    • Providing training sessions for employees and management on system usage and compliance requirements.
  • Deliverables:
    • Internal audit reports and action plans for corrective measures.
    • Training materials and records.
    • Improved employee competency and awareness.
Stage 5:

Certification Preparedness (5%)

In the final phase, the organization is prepared for external audits and certification assessments.

  • Objective: To ensure the organization meets all requirements for successful certification and achieves formal recognition.
  • Activities:
    • Conducting pre-certification audits to simulate the official evaluation process.
    • Providing detailed feedback and addressing any remaining gaps.
    • Coordinating with certification bodies and facilitating the certification process.
  • Deliverables:
    • Certification readiness report.
    • Action plans for final adjustments.
    • Support during the certification audit.
QPlus Management System Consultancy Phases
QPlus Management System Consultancy Phases
QPlus Consultancy Project Deliverables
QPlus Consultancy Project Deliverables

Have a project in mind?

Looking for Business CoachingEFQM Excellence Model ImplementationAudits and AssessmentsQuality SolutionsProducts and Services InspectionsManagement Systems Consulting?

Switch The Language

    Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.

    ADDRESS

    63739 street lorem ipsum City, Country

    PHONE

    +12 (0) 345 678 9

    EMAIL

    info@company.com

    Cart